| With the raft of cuts throughout the project and the issues that keep coming it hasn’t really inspired much confidence in the project management and contractors.
What Spook has said is correct but the power supply and water supply/infrastructure I would imagine will have been planned in accordance with what is being built and its requirements. I’m quite surprised that the power issue and this now water issue have occurred.
I am happy with the improvements as a fan but when I look at the fact 12.2 million has gone into this and the raft of cuts and the possible abandonment of the south east stand plans. I would have honestly expected things to go much more smoothly.
With contractors and projects you would generally scrutinise, review and challenge regularly as the end customer. It's a massive task and a lot of work at every stage of the process. To a degree though you have to trust the contractors who are the professionals with the knowledge.
No doubt there will be a lot of conversations taking place.
|
|
|
|
Rank | Posts | Team |
Fringe Player | 813 | |
Joined | Service | Reputation |
Jan 2022 | 3 years | |
Online | Last Post | Last Page |
Nov 2024 | Nov 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
78850_1709244176.jpg :d7dc4b20b2c2dd7b76ac6eac29d5604e_78850.jpg |
|
| Quote: Trojan Horse "With the raft of cuts throughout the project and the issues that keep coming it hasn’t really inspired much confidence in the project management and contractors.
What Spook has said is correct but the power supply and water supply/infrastructure I would imagine will have been planned in accordance with what is being built and its requirements. I’m quite surprised that the power issue and this now water issue have occurred.
I am happy with the improvements as a fan but when I look at the fact 12.2 million has gone into this and the raft of cuts and the possible abandonment of the south east stand plans. I would have honestly expected things to go much more smoothly.
With contractors and projects you would generally scrutinise, review and challenge regularly as the end customer. It's a massive task and a lot of work at every stage of the process. To a degree though you have to trust the contractors who are the professionals with the knowledge.
No doubt there will be a lot of conversations taking place.'"
Quite right… much of my career has been in engineering assurance… working on the ‘client’ side…. The contractor should have evidence of requirements management, design assurance… and the sign offs into testing and commissioning… all of which should have been presented at final inspection and handover!
|
|
|
|
Rank | Posts | Team |
First Team Player | 260 | No Team Selected |
Joined | Service | Reputation |
Aug 2020 | 4 years | |
Online | Last Post | Last Page |
Nov 2024 | Nov 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
78184_1608479023.jpeg :d7dc4b20b2c2dd7b76ac6eac29d5604e_78184.jpeg |
|
| Quote: Prince Buster "Has this project actually been managed ? It's seems to be one Horlicks after another. Ellis must be livid spending all his time trying to put thinks right others have messed up. Whilst he is having to do this, he can't get on with the rest of his upgrade plans'"
I’d be absolutely amazed if this stand hasn’t had a firm project managing it..
I also doubt if MC or JM will have had much knowledge on construction, and would of thought they would of had some outfit doing the management side of things..
I seem to recall some talk on here about a firm who were managing it though.
The bottom line is … if you employ a company to build you a stand… you expect them to do it to a good standard…
Questions will undoubtedly be asked about how it was ever signed off, with the electrical and water problems that have now arisen..
|
|
|
|
Rank | Posts | Team |
Player Coach | 13797 | |
Joined | Service | Reputation |
Oct 2006 | 18 years | |
Online | Last Post | Last Page |
Nov 2024 | Nov 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
29100_1291104497.jpg 1/10:d7dc4b20b2c2dd7b76ac6eac29d5604e_29100.jpg |
|
| Water and electric demand are predetermined and reinforcement of infrastructure and switch gear is processed well in advance of a project. Either someone has got the calcs wrong or there is a fault somewhere.
|
|
|
|
|
Rank | Posts | Team |
International Star | 2264 | |
Joined | Service | Reputation |
Dec 2011 | 13 years | |
Online | Last Post | Last Page |
Nov 2024 | Oct 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
65068_1324055672.jpg What's pink & hard first thing in the morning?
The financial time crossword
[url=http://imageshack.us/photo/my-images/864/pinkhards.jpg/:39bjthd5][img:39bjthd5]http://img864.imageshack.us/img864/5724/pinkhards.jpg[/img:39bjthd5][/url:39bjthd5]:d7dc4b20b2c2dd7b76ac6eac29d5604e_65068.jpg |
|
| Quote: Khlav Kalash "Water and electric demand are predetermined and reinforcement of infrastructure and switch gear is processed well in advance of a project. Either someone has got the calcs wrong or there is a fault somewhere.'"
There's a third option, the builder in order to improve their profit margin to deliver the project on time and within budget has taken shortcuts and cost savings such as installing 63mm mains supply instead of 90mm
|
|
|
|
Rank | Posts | Team |
Player Coach | 13797 | |
Joined | Service | Reputation |
Oct 2006 | 18 years | |
Online | Last Post | Last Page |
Nov 2024 | Nov 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
29100_1291104497.jpg 1/10:d7dc4b20b2c2dd7b76ac6eac29d5604e_29100.jpg |
|
| Quote: financialtimes "There's a third option, the builder in order to improve their profit margin to deliver the project on time and within budget has taken shortcuts and cost savings such as installing 63mm mains supply instead of 90mm
If that's the case then they're bang to rights, and its not a quick or cheap fix. Depending on the alignment it could be quite disruptive and they’ll dig up that lovely new car park.
The mains supply should've been signed off by Yorkshire Water.
|
|
|
|
|
Rank | Posts | Team |
International Star | 2264 | |
Joined | Service | Reputation |
Dec 2011 | 13 years | |
Online | Last Post | Last Page |
Nov 2024 | Oct 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
65068_1324055672.jpg What's pink & hard first thing in the morning?
The financial time crossword
[url=http://imageshack.us/photo/my-images/864/pinkhards.jpg/:39bjthd5][img:39bjthd5]http://img864.imageshack.us/img864/5724/pinkhards.jpg[/img:39bjthd5][/url:39bjthd5]:d7dc4b20b2c2dd7b76ac6eac29d5604e_65068.jpg |
|
| Quote: Khlav Kalash "If that's the case then they're bang to rights, and its not a quick or cheap fix. Depending on the alignment it could be quite disruptive and they’ll dig up that lovely new car park.
The mains supply should've been signed off by Yorkshire Water.'"
I'm neither confirming or denying this is the issue, but if the existing mains was 63mm it would have cost a lot to replace it, also the old mains was delivering most of the water to ground level and 1st story, now it needs to go up considerably higher requiring a greater pressure, 90mm will allow 70% more pressure than 63mm.
My expertise is more of the electrical side of things and I believe that issue was a much simpler and cheaper fix as the capacity of the site is similar to what it was prior to the upgrades, the LED floodlights use around 50% less power than the old discharge ones (and deliver around 30% more lumens), which means that capacity was available for the main stand.
|
|
|
|
Rank | Posts | Team |
Club Coach | 5320 | |
Joined | Service | Reputation |
Oct 2004 | 20 years | |
Online | Last Post | Last Page |
Nov 2024 | Nov 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
10236.jpg :10236.jpg |
|
| Quote: financialtimes "I'm neither confirming or denying this is the issue, but if the existing mains was 63mm it would have cost a lot to replace it, also the old mains was delivering most of the water to ground level and 1st story, now it needs to go up considerably higher requiring a greater pressure, 90mm will allow 70% more pressure than 63mm.
My expertise is more of the electrical side of things and I believe that issue was a much simpler and cheaper fix as the capacity of the site is similar to what it was prior to the upgrades, the LED floodlights use around 50% less power than the old discharge ones (and deliver around 30% more lumens), which means that capacity was available for the main stand.
Regarding the water, I understand your point in respect of the up lift in height. But the players changing rooms and toilets are all ground level. Plus as I understand things after the Bradford game the players had to shower in the old changing rooms, so obviously no problem there. I didn't hear about any water problems in the boxes either. Right at the start of this new stand costs were cut, the rain screens were the first to go.
|
|
|
|
|
Rank | Posts | Team |
Player Coach | 4130 | No Team Selected |
Joined | Service | Reputation |
Aug 2007 | 17 years | |
Online | Last Post | Last Page |
Oct 2024 | Apr 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
34595_1297504122.jpg [color=#BF0000:1qi6asc8]WAKEFIELD FANS ARE BORN, NOT MANUFACTURED.WE DO NOT CHOOSE, WE ARE CHOSEN. THOSE WHO UNDERSTAND NEED NO EXPLANATION. THOSE WHO DONT, DONT MATTER.[/color:1qi6asc8]
[color=#0000FF:1qi6asc8]I AM THE SEEKER OF TRUTH AND
JUSTICE[/color:1qi6asc8]:d7dc4b20b2c2dd7b76ac6eac29d5604e_34595.jpg |
|
| I blame statler and waldorf
|
|
|
|
Rank | Posts | Team |
International Star | 2264 | |
Joined | Service | Reputation |
Dec 2011 | 13 years | |
Online | Last Post | Last Page |
Nov 2024 | Oct 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
65068_1324055672.jpg What's pink & hard first thing in the morning?
The financial time crossword
[url=http://imageshack.us/photo/my-images/864/pinkhards.jpg/:39bjthd5][img:39bjthd5]http://img864.imageshack.us/img864/5724/pinkhards.jpg[/img:39bjthd5][/url:39bjthd5]:d7dc4b20b2c2dd7b76ac6eac29d5604e_65068.jpg |
|
| Quote: Prince Buster "Regarding the water, I understand your point in respect of the up lift in height. But the players changing rooms and toilets are all ground level. Plus as I understand things after the Bradford game the players had to shower in the old changing rooms, so obviously no problem there. I didn't hear about any water problems in the boxes either. Right at the start of this new stand costs were cut, the rain screens were the first to go.'"
Are the showers fed from the mains or from tanks located on the upper floors of the new stand?
When I was at the barrow game I took up the offer of the hospitality at £30 to check it all out, I was extremely disappointed at my findings, I have resisted posting on here all the things I see wrong with the build as didn't want to be associated with the "Negative posters brigade" but fi I was Matt I would be absolutely flippin livid at what's been done, so a simple "for instance" why is the bar and toilets on the pitch side of the stand, they should be on the car park side, with as much glass and natural light coming in from the pitch, the quality of the internal fit is sub standard, I think a DIY'er could have done as good a job the bar is simply not big enough, the main room is too small, should be 3 times the size with the ability to partition off smaller areas as and when needed (as is the case with similar facilities). I could hear running water all the time, so there was a leak somewhere and where will that water be going? There was plenty more wrong with it but I don't want to go to town on here as I'm sure ME is on top of sorting these things out.
|
|
|
|
Rank | Posts | Team |
Player Coach | 4689 | |
Joined | Service | Reputation |
Jul 2009 | 15 years | |
Online | Last Post | Last Page |
Nov 2024 | Nov 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
46136_1705770219.jpg M.I.B. ??....nope - M.I.R.W.B !!!
Sent from my steam-powered Sinclair ZX81.:d7dc4b20b2c2dd7b76ac6eac29d5604e_46136.jpg |
|
| Sounds like we would have been better off employing you to project manage it, FT ??
Is it possible to switch things round and do as you suggest, or does the structural design prevent that from happening ??
|
|
|
|
Rank | Posts | Team |
International Star | 2264 | |
Joined | Service | Reputation |
Dec 2011 | 13 years | |
Online | Last Post | Last Page |
Nov 2024 | Oct 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
65068_1324055672.jpg What's pink & hard first thing in the morning?
The financial time crossword
[url=http://imageshack.us/photo/my-images/864/pinkhards.jpg/:39bjthd5][img:39bjthd5]http://img864.imageshack.us/img864/5724/pinkhards.jpg[/img:39bjthd5][/url:39bjthd5]:d7dc4b20b2c2dd7b76ac6eac29d5604e_65068.jpg |
|
| Quote: FIL "Sounds like we would have been better off employing you to project manage it, FT ??
TBH I was a project manager for 2 years for a £760m turnover electrical distributor, where I looked after 3 of the largest electrical contractors in the UK, I project managed the lighting for the institute of sports facilities for the commonwealth games stadiums in Manchester (Now man city's stadium and sports village) during its construction, this would have been a lot simpler.
As for changing things around, I believe it can be done but at massive inconvenience and cost, it would have been a fraction of the cost to have had it right in the first place.
|
|
|
|
Rank | Posts | Team |
Club Coach | 5320 | |
Joined | Service | Reputation |
Oct 2004 | 20 years | |
Online | Last Post | Last Page |
Nov 2024 | Nov 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
10236.jpg :10236.jpg |
|
| Quote: financialtimes "Are the showers fed from the mains or from tanks located on the upper floors of the new stand?
When I was at the barrow game I took up the offer of the hospitality at £30 to check it all out, I was extremely disappointed at my findings, I have resisted posting on here all the things I see wrong with the build as didn't want to be associated with the "Negative posters brigade" but fi I was Matt I would be absolutely flippin livid at what's been done, so a simple "for instance" why is the bar and toilets on the pitch side of the stand, they should be on the car park side, with as much glass and natural light coming in from the pitch, the quality of the internal fit is sub standard, I think a DIY'er could have done as good a job the bar is simply not big enough, the main room is too small, should be 3 times the size with the ability to partition off smaller areas as and when needed (as is the case with similar facilities). I could hear running water all the time, so there was a leak somewhere and where will that water be going? There was plenty more wrong with it but I don't want to go to town on here as I'm sure ME is on top of sorting these things out.
From my experience ,I agree with everything you say. It's not being negative, but being realistic. Many of those things you have seen should not have occurred . Pity Matt Ellis didn't take over much sooner
|
|
|
|
Rank | Posts | Team |
Junior Player | 61 | |
Joined | Service | Reputation |
Mar 2024 | 1 year | |
Online | Last Post | Last Page |
Nov 2024 | Nov 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
: |
|
| What's very disappointing for Matt and the club is that the new era has started off the field in such a way .
The new stand isn't just a new stand it's much more than that , it's a significant move forward and the first project that will hopefully take the club to where we all believe it can compete along with many other projects to come .
Whilst I wouldn't go as far as to say we've fallen at the first fence it's still none the less unacceptable .
As others have said Matt must be fuming , the man comes across as someone who insists on the highest of standards and in my opinion is the real deal , he's not bought the club to scratch around just above the bottom of Super League .
Hopefully it gets sorted relatively quickly .
|
|
|
|
Rank | Posts | Team |
Moderator | 21024 | |
Joined | Service | Reputation |
Oct 2008 | 16 years | |
Online | Last Post | Last Page |
Nov 2024 | Nov 2024 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
41119.jpg A dog is not considered a good dog because he is a good barker. A man is not considered a good man because he is a good talker - Buddha:41119.jpg |
Moderator
|
| I'm pretty sure he knew he wasn't buying a finished product.
He'll get these things sorted I'm sure.
To a certain extent this is the advantage of being in Championship this year.
We can resolve them slightly under the radar so we can be up and running in Super League
|
|
|
|
|
|