| Well it got people speculating . It is a damn mess and not expecting anything stupendous . Few tiers of safe terracing and a basic roof to to host away support.
| | |
Rank | Posts | Team |
Club Owner | 36149 | Wakefield Trinity |
Joined | Service | Reputation |
Oct 2004 | 21 years | |
Online | Last Post | Last Page |
Mar 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote dboy="dboy"The gantry can't be lowered - it's already "flat", and permission couldn't be achieved for a roof of a height that would go above the gantry.
A roof at the permissible height would obscure the gantry sight lines.
This was covered in a fan's forum at BV, in the none too distant past.
It's not a myth; it's physics and planning permissions.'"
I remember and your right. We differ only in that you believe it and I don’t.
The myth I refer to was SKY saying no, they didn’t.
The roof at permissible height is incorrect imo. To me that the club was making excuses. Roughly speaking the height of the old west stand sets a historical precedent and that I know to be true.
Problem is the roofing used is technically temporary and that’s where the restriction is, the next size up so to speak was too pricy. Also the bit they did build is just as much in site lines as it would be full length, never really got that argument.
To be honest I don’t blame the club it was never vital, at the time it was just a fop. The roof has served its purpose. What I would be interested in is knowing the lifespan of these roofs, that I don’t know?
Anyway these are side issues, it’s just fair to say the west terrace is the most limited section of the ground.
| | |
|
Rank | Posts | Team |
Club Owner | 36149 | Wakefield Trinity |
Joined | Service | Reputation |
Oct 2004 | 21 years | |
Online | Last Post | Last Page |
Mar 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote Wakefield City="Wakefield City"Didn’t realise it went to planning and WMDC rejected them, should be in the public domain if that’s the case. Remember early 2000s talk of us buying the old wilderspoon main stand for the west side. Had to go through an alley underneath some terrace houses away end at Luton, no chance of getting emergency vehicles through there.
Up the Trin'"
Never needed to go to public, these were feasibility studies, all rejected in advance so no point.
As for Luton you’re spot on and there are others but you’re missing the point.
These are stands that were built pre-regulations and thus have less strict criteria. The problem comes when you replace them. When you do that to have to meet modern standards, you can’t replace like for like. That’s one of the reasons Luton’s ground has barely been developed, that is a ground in a truly awfull position.
Sure you’ve been to York? Without wanting to patronise but do you think you’d be allowed to build the Shambles under modern planning? That’s the problem.
The only real solution would be if the council would close the path and we could buy the land and perhaps some of the adjoining garden land. However we are in ransom strip territory there, nightmare.
| | |
Rank | Posts | Team |
Club Captain | 2805 | Wakefield Trinity |
Joined | Service | Reputation |
Jan 2019 | 6 years | |
Online | Last Post | Last Page |
May 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
|
Quote Fishermanscap="Fishermanscap"Thought I'd start this so folk can add any updates they come across so as to keep folk as well informed as possible, pin it maybe mods?
I'll kick off with this I found on the net, it's the architect's own site and gives a few more pics and bits of info, not much but a bit. Enjoy
https://www.afl-architects.com/news/pla ... evelopment'"
Just got around to reading the information by the architect from the link above.
I
Phase 1
The new East Stand will become an impactful focal point, with a FanZone and landscaped car parking creating a sense of arrival for travelling fans. An improved concourse will wrap around the eastern side of the new stand, facilitating safe and fully accessible movement for all visitors.
In addition to the East Stand, the plans also outline further works to increase the stadium capacity from 7,258 to a total of 8,866. The North Stand, which is currently subject to health and safety restrictions, will be refurbished to increase capacity from a restricted 1,500 capacity up to 3,500 capacity. Existing floodlights will be upgraded to the latest LED technology and a 4G pitch installed for all weather use by both club and the community.
Phase 2
Bringing together both club and the Wakefield Trinity Community Trust, phase two of the plans will see the refurbishment of the Rollin Shack. This will provide improved, multi-functional facilities to better engage with local residents. The proposals outline several provisions including a health and fitness suite, a strength and conditioning gym, a studio, learning spaces, meeting rooms, function lounge, club retails, café and changing facilities.
These plans set out a broader vision for the stadium and its place within the Belle Vue community, bringing substantial social, environmental and economic benefits. With these new facilities, the Trust will meet its aims to assist in the regeneration of the area through engagement activities and the promotion of social inclusion.
I can’t decide if this company will only be involved in phase 1 and 2, and not the complete stadium. Is it possible, that we only have funding for phase 1&2, therefore nothing drawn up for West and South side.
I think the details are a bit sketchy at the moment. JM said on Monday night, this a 12+ month build. Is that just for phase 1 or both 1&2?
Is it likely, that 1&2 together will take 2 years, meaning it will be 2024 at the earliest, before West and South ends can be considered for redevelopment?
In the previous Q&A, JM said things had to be scaled back, due to funding.
Perhaps I’m just a born pessimist, best news we’ve had for ages re Stadium, and I’m probably overthinking.
Anyone else think we need some more details, just for clarification?
|
|
Quote Fishermanscap="Fishermanscap"Thought I'd start this so folk can add any updates they come across so as to keep folk as well informed as possible, pin it maybe mods?
I'll kick off with this I found on the net, it's the architect's own site and gives a few more pics and bits of info, not much but a bit. Enjoy
https://www.afl-architects.com/news/pla ... evelopment'"
Just got around to reading the information by the architect from the link above.
I
Phase 1
The new East Stand will become an impactful focal point, with a FanZone and landscaped car parking creating a sense of arrival for travelling fans. An improved concourse will wrap around the eastern side of the new stand, facilitating safe and fully accessible movement for all visitors.
In addition to the East Stand, the plans also outline further works to increase the stadium capacity from 7,258 to a total of 8,866. The North Stand, which is currently subject to health and safety restrictions, will be refurbished to increase capacity from a restricted 1,500 capacity up to 3,500 capacity. Existing floodlights will be upgraded to the latest LED technology and a 4G pitch installed for all weather use by both club and the community.
Phase 2
Bringing together both club and the Wakefield Trinity Community Trust, phase two of the plans will see the refurbishment of the Rollin Shack. This will provide improved, multi-functional facilities to better engage with local residents. The proposals outline several provisions including a health and fitness suite, a strength and conditioning gym, a studio, learning spaces, meeting rooms, function lounge, club retails, café and changing facilities.
These plans set out a broader vision for the stadium and its place within the Belle Vue community, bringing substantial social, environmental and economic benefits. With these new facilities, the Trust will meet its aims to assist in the regeneration of the area through engagement activities and the promotion of social inclusion.
I can’t decide if this company will only be involved in phase 1 and 2, and not the complete stadium. Is it possible, that we only have funding for phase 1&2, therefore nothing drawn up for West and South side.
I think the details are a bit sketchy at the moment. JM said on Monday night, this a 12+ month build. Is that just for phase 1 or both 1&2?
Is it likely, that 1&2 together will take 2 years, meaning it will be 2024 at the earliest, before West and South ends can be considered for redevelopment?
In the previous Q&A, JM said things had to be scaled back, due to funding.
Perhaps I’m just a born pessimist, best news we’ve had for ages re Stadium, and I’m probably overthinking.
Anyone else think we need some more details, just for clarification?
|
|
| | |
Rank | Posts | Team |
Player Coach | 1692 | No Team Selected |
Joined | Service | Reputation |
Feb 2010 | 15 years | |
Online | Last Post | Last Page |
Mar 2023 | Mar 2023 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| This is such amazing news
The best news I’ve had all year in fact
I’m not sure we’ve ever got to the point where we’ve submitted plans before
I’ve seen artist impressions , maybe 3 lots now?
I’d like to go early and say the stand need naming after MC
I’m not sure I’m ready to believe it just yet
Is this really going to happen for us 
| | |
|
Rank | Posts | Team |
International Chairman | 10634 | Wakefield Trinity |
Joined | Service | Reputation |
Aug 2002 | 23 years | |
Online | Last Post | Last Page |
May 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote musson="musson"
I’d like to go early and say the stand need naming after MC
'"
 That would certainly feed the resident haters on the two rugby forums.
I suppose the sensible options would be a sponsorship naming or Neil Fox?
| | |
Rank | Posts | Team |
Player Coach | 5023 | Wakefield Trinity |
Joined | Service | Reputation |
Jul 2009 | 16 years | |
Online | Last Post | Last Page |
May 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| The "Neil Fox Stand" sounds good to me and probably a lot of others too, I would suspect ??
| | |
Rank | Posts | Team |
Club Owner | 36149 | Wakefield Trinity |
Joined | Service | Reputation |
Oct 2004 | 21 years | |
Online | Last Post | Last Page |
Mar 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote FIL="FIL"The "Neil Fox Stand" sounds good to me and probably a lot of others too, I would suspect ??'"
I imagine it will be called after a sponsor, but that could be its actual name, no issue from me.
| | |
|
Rank | Posts | Team |
International Star | 3733 | Wakefield Trinity |
Joined | Service | Reputation |
Oct 2015 | 10 years | |
Online | Last Post | Last Page |
May 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote musson="musson"This is such amazing news
The best news I’ve had all year in fact
I’m not sure we’ve ever got to the point where we’ve submitted plans before
I’ve seen artist impressions , maybe 3 lots now?
I’d like to go early and say the stand need naming after MC
I’m not sure I’m ready to believe it just yet
Is this really going to happen for us
'"
Sorry, but I can think of several legendary names associated with our club who would or should be further up the list on any stand naming. After all, it wasn’t that long ago he was willing to sell the club for £1
| | |
Rank | Posts | Team |
International Chairman | 10634 | Wakefield Trinity |
Joined | Service | Reputation |
Aug 2002 | 23 years | |
Online | Last Post | Last Page |
May 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote musson="musson" I’d like to go early and say the stand need naming after MC '"
Quote musson="Wollo-Wollo-Wollo-Wayoo" That would certainly feed the resident haters on the two rugby forums.'"
Quote musson="Eastern Wildcat"Sorry, but I can think of several legendary names associated with our club who would or should be further up the list on any stand naming. After all, it wasn’t that long ago he was willing to sell the club for £1'"
see what I mean? 
| | |
Rank | Posts | Team |
First Team Player | 176 | No Team Selected |
Joined | Service | Reputation |
Dec 2020 | 4 years | |
Online | Last Post | Last Page |
Mar 2022 | Mar 2022 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote Eastern Wildcat="Eastern Wildcat"Sorry, but I can think of several legendary names associated with our club who would or should be further up the list on any stand naming. After all, it wasn’t that long ago he was willing to sell the club for £1'"
I reckon he’d still sell for a quid. He’s turned around the debacle of Glover and the last regime who somehow managed to plunge the club into the worst financial position ever!
| | |
 | |
All views expressed are those of the author and not necessarily those of the RLFANS.COM or its subsites.
Whilst every effort is made to ensure that news stories, articles and images are correct, we cannot be held responsible for errors. However, if you feel any material on this website is copyrighted or incorrect in any way please contact us using the link at the top of the page so we can remove it or negotiate copyright permission.
RLFANS.COM, the owners of this website, is not responsible for the content of its sub-sites or posts, please email the author of this sub-site or post if you feel you find an article offensive or of a choice nature that you disagree with.
Copyright 1999 - 2025 RLFANS.COM
You must be 18+ to gamble, for more information and for help with gambling issues see https://www.begambleaware.org/.
2025-05-18 16:21:37 LOAD:5.89208984375
|
|
|
POSTS | ONLINE | REGISTRATIONS | RECORD |
---|
19.67M | 1,551 | 80,283 | 14,103 |
|