Quote: JEAN CAPDOUZE "Leeds desperately need to rebuild the North Stand, with a double decker all seater and proper leg room for the 21st century. At the moment the North Stand is a disgrace.
As for the Western Terrace, what is needed is a double decker with all seating above and a standing terrace below, and yes a roof over the top.
'"
The North Stand is being demolished in October. Unfortunately Leeds have in my view over-done the size of the corporate venue inside its replacement and the seating capacity of the new stand will actually be lower than the existing one (a capacity reduction offset by the seats in the South Stand).
FWIW there is no other club in the world who has even tried to develop a stadium on this scale (the three stands will have cost £25m over 12 years by the time its done) without any external funding from a council, bolt-on to a planning consent or from the sale of their old ground. Leeds are doing this themselves and it is no easy task.