Anyway enough of all the eco warrior swampy stuff and onto what else has changed.
The concrete base near the entrance has been extended
lots of work is ongoing preparing the East stand car park
All the seats including those on the disabled platform look to be in place in the north stand. No seats have gone into the South stand as of yet. However the three seats that were once in place there, have now been removed
Behind the North stand close to the Tesco goods entrance are, for want of a better word "Light Sticks". These aluminium lighting posts will be placed around the stadium walkways to brighten the way to the Saintly blessing.
Electrical work is also ongoing within the stadium. Against the side of the West stand can be seen the Electrical conduits.
The builder entering the gap between the North and West stands also provides a good sense of scale with regard to the outer blockwork perimeter wall.
Are those boxes with concept written on them for Concept bathroom furniture?
Lights have also been fitted underneath the East stand terracing. This looks like its the concourse lighting
