Some pics from today (saturday) when the builders were hard at work
The Stadium, looms even larger in the background, while in the forground are huge concrete man holes and drains waiting to be fitted
The pitch is littered with steelwork waiting to go up
The South West corner of the stadium terracing is now in place
Fitting part of the back wall for the south stand
The south stand steelwork now swoops round to the South west of the stadium.
The east stand is also starting to rise.
Looking through the gap in the East stand towards the West stand you can see that the corner of this terrace looks cut away.
The North stand starts to rise
Note to the left of the picture you can see the first few roof struts for the south stand have been fitted to cover the south stand seats. It wont be long i feel before the roof stretches from South to west
